Living in a house without a car park can be a bit of a hassle. You might have to park on the street or find a car space close to your home, which can be difficult during busy times.

Walking a street away from your home is not necessary to find a parking spot. However, if you have space on your property for a driveway or garage, you can easily use the driveway as a secure parking spot for your car at a low cost by building a Concrete Driveways Central Coast.

It takes a lot of hard work to create a perfect concrete driveway. Therefore, you need to plan carefully so that the driveway will last for a long time.

Concrete driveways can be finished in different colors and designs to make your home’s entrance stand out. Read on, as, in this article, we will tell you how you can build a concrete driveway in easy steps.

Steps to build a concrete driveway

Step 1 – Make sure there are no underground utilities before you start digging

Before you do anything else, you should contact your State’s Dial Before You Dig service. Dial Before You Dig is an organization that helps people find the location of underground utility lines before they start any construction or excavation projects.

The organization helps you find any shallow utility lines in the construction area. If there are any lines in the way of your construction, you may be able to move them. DBYD can help you more about this.

Step 2 – Research your land and know what your boundaries are

Look into the research on your property. Then, inspect the blueprints of the land. Identify where your land boundary is and then mark it with spray paint.

Also, mark the location of any submerged utility cables around the project area with spray paint, using the supplied information from DBYD.

Step 3 – Mark the area where you will be working and define the boundaries.

You will need to place some wooden stakes around the driveway area. Then use some string to mark it off.

Step 4 – Remove the topsoil and level out the area. 

Now, you will need to remove the topsoil from the construction area. You can use a shovel or an excavator machine to do this. Once you have removed the topsoil, you will need to level out the site. It would be best if you aimed to remove around 250mm of soil. You can also take professional help from Concrete Driveways in Central Coast to make things easier.

You will typically need a dingo or mini excavator for a residential driveway job. However, for a more extensive driveway with more digging, you might need a 5 to 7 tonne track-mounted excavator.

Step 5 – Place wooden forms around the project area. Secure them in place with stakes.

You will need to put down some forms around the project area to help make sure that the poured concrete doesn’t spill outside of the project area and only goes into the correct spot. Make sure that your forms are straight and well-secured.

Step 6 – Add the sand to make the soil firm and gravel to ensure that the base is thick enough.

Adding filler-like sand to your home base can help make it more stable. You should also add a thin layer of gravel on top to ensure the floor is thick enough. The base usually needs to be between 4 and 10 inches, depending on the soil conditions.

Step 7 – Compact gravel and soil

Use a small plate compactor on the project area. Then, wet the surface again.

Step 8 – Use steel reinforcing mesh 

You can reinforce your driveway’s foundation by using reinforcing mesh or rebar (a grid pattern). This is an essential step in making your driveway stronger.

Step 9 – Pour concrete.

Once you have completed all of the steps up to this point, it is time to pour the concrete. Be sure to follow this step carefully to get the best results. You can use a skid steer with a front bucket, tractor, or wheelbarrow to pour concrete and then spread it evenly across the project area.

Step 10 – Level, Smooth out, and groove the concrete

To smooth and level the concrete, use a trowel and a leveler. Next, make grooves in the driveway using a groover to help prevent any cracks. You can also use a broom to finish the concrete to make it less slippery when it rains. Finish with a broom because it will help keep you safe when it is wet outside.

Step 11 – Set and cure concrete

Concrete needs to set, and then cured. This is done by either using a sealant or watering it every day for a few days.

Curing concrete is vital because it makes the concrete harden and stronger. If you don’t cure your concrete correctly, it can lead to weak cement that may not last as long.

Concrete curing time can vary. It takes a few days to set and between 1 and 3.5 weeks to cure fully, but it is worth waiting. Make sure you don’t rush the curing process!

Step 12 – Park your car!

You have now finished curing your concrete, so it is safe to use as a park!

Conclusion

Parking your car on a new concrete driveway is an exciting moment. After all, you have just completed a big home improvement project! You can start your project now that you know how to pour a concrete driveway! Or you can get help from Concrete Driveways experts in Central Coast. So be sure to enjoy it and take pride in your work. If you followed all of the steps in this article, then your new driveway should last for many years to come.

 

Disclaimer: This is a generic Information & post; content about the services can be changed from time to time as per your requirements and contract. To get the latest and updated information, contact us today or visit our website.

You may also like

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy